Thursday, January 6, 2011

December Shipyard Update

By Zach Simonson-Bond

Phases II and III of Adventuress' Centennial Restoration have been flying by.  December saw some exciting milestones from both the starboard bow and counter stern!

Phase II: Starboard Bow
Arthur Minnerly puts in the last futtock
The most notable accomplishment on the starboard bow is the completion of framing just before December 25.  Shipwrights Brad Seamans and Arthur Minnerly lead the replacement of Adventuress' frames and they did so with excellent attitudes!  Often, you could hear them swapping jokes and speaking in accents and they methodically strengthened the starboard bow.

Their scope of work extended from the new stem, installed last year, to the starboard midships reframing that happened in 2005-2006, and from the top plank to just below the waterline.  Planking on the starboard bow will begin in January, 2011.

Other Phase II accomplishments include the fabrication of a new chain plate and associated strapping which are currently being galvanized before they are secured to Adventuress.

Phase III: Counter Stern
The counter stern project has also had some exciting milestones, namely a strengthening of the entire steering system from the rudder to the wheel.  

Shipwright Andy C. works on the housing
A new rudder design has been completed that will provide more strength and stability for Adventuress' next half century.  An added benefit of the new design is that it will allow the rudder to be more easily removed and inspected in future years.

The rudder attaches to the Edson "worm steerer" at roughly deck level.  The worm steerer is a gear which provides mechanical advantage between the ships wheel and the rudder, making Adventuress easier to drive.  While strengthening the rudder, it was also decided to rebuild the box that holds the worm gear.  Shipwrights Blaise Holly and Andy C. are working on a new housing that will provide increased security for the worm gear and strengthen the entire system.


Leland with the transom blank
Meanwhile, shipwright Leland Gibson has been making a transom "blank."  Essentially, it is a curved board that the transom will be cut from.  Leland has been laminating boards together, two sapele with a top layer of teak, in preparation for the new transom!

Last, we're excited to announce that a large piece of white oak, 25 feet long, has been identified in New York for the horn timber.  It will be shipping in early January.  Shipwright Blaise Holly has already made the pattern for the timber and waiting eagerly for its arrival.

Maintenance
Regular maintenance is also moving steadily forward.  The inclement weather has kept our volunteers mostly under cover.  As a result, they have completed the disassembly and cleaning of Adventuress' blocks, the soles (or floors) of the ship are getting many protective coats of varathane, and the ship's spars have been scuffed in preparation for varnish!

Dont forget!  We have a Volunteer Work Weekend coming up at the end of January.  Come join us and help prepare Adventuress for her next sailing season.  The Work Weekend will be on Jan. 22 - 23.  Click here for more info.

Thank you all who have volunteered or donated during these projects.  You are keeping Adventuress in the best shape of her life!

Brad removes excess fastener material
Nate and Tom working on blocks!

Wednesday, December 1, 2010

Shipyard Update!

By Capt. Joshua Berger

Since hauling the ship out of the water on November 3, Adventuress crew, volunteers and the shipwrights at Haven Boatworks have been hard at work. We are fully engaged in arguably the most extensive shipyard period that Adventuress has ever seen.

We have embarked upon Phases II and III of the Centennial Restoration, as well as extensive winter maintenance projects. Here is a an update:

Phase II: Starboard Bow Restoration
As the scaffolding was erected, Haven Shipwrights, assisted by Adventuress crew and volunteers, began tearing windows into the starboard bow. In order to map out a strategy, planks were taken off in order to assess the frame condition beneath. Everything seemed as we had expected from our work last year on the port side and we quickly engaged in a plan. To date, we have removed all the planking we will need, already replaced 18 futtock sections, and have removed the old chain plate.

Phase III: Counter Stern Restoration
With careful planning and direction from Haven, we now have a good scope of work for the Counter Stern portion of the Centennial Restoration that includes the replacement of almost 25 feet of Adventuress' horn timber. This is a tremendous project that will undoubtedly bring life to the ship for many generations to come. This repair necessitated the removal of the rudder and will give us a great opportunity to refresh its associated metal work and bearings.

Rigging:
In addition to the extensive effort to prepare Adventuress for the next century of her life, Sound Experience has embarked upon an exceptional and rigorous full inspection of the rigging and spars. In collaboration with the U.S. Coast Guard, we have proactively engaged in an expanded inspection and inventory process, including the full cataloging of each component of the ship's standing rigging, running rigging and the spars.

As part of this thorough assessment, we decided to pull Adventuress’ mainmast in order to inspect the iron and wood condition aloft. On Monday, November 8, led by several hitches and a supportive crew, the mast came out without a glitch. We are happy with what we have found thus far. We will continue to develop a strategy for this winter's, and future, rig-repair and replacement.

Winter Work Weekends:
On the weekend of November 21 - 22, we had 25 generous and hard-working volunteers come help finish building the winter cover. They also began to breakdown and clean of all the running rigging blocks. The cover was pulled over the ship just in time as almost six inches of snow fell the next morning! Thank you to all those that came and we look forward to seeing you all again next weekend, December 4 - 5. Please join us!

All and all, it has been a fantastic and exciting start to a winter full of hard work during true winter conditions (thank you El Nino). Praises to our Winter Mate, Ryan Short; Winter Engineer, Jessup Coffin and dedicated Crew, Jen Grod. It’s not easy work and the conditions are difficult, but these folks are devoted and passionate. What a community we continue to build!

More updates later…

Capt. Joshua Berger
Schooner ADVENTURESS















Shipwright Blaise Holly removes the horn timber

Hoisting out the mainmast!
















Once, there was a mast here!

The AMAZING winter volunteers

Monday, October 25, 2010

Nautical Book Exchange!

Winter is coming. Do you have the nautical books you'll need to make it through the cold, soggy months that lie ahead? Here's your chance to get the maritime books you'll need, and share the ones you don't!

Our friends at Three Sheets Northwest, the online boating magazine, have teamed up with the Armchair Sailor to offer their first ever nautical book exchange! Come to the Center for Wooden Boats (map) in Seattle on Friday, November 5 from 7 to 9 p.m. with books to swap. All nautical books are welcome.

The proceeds from this event will support the Center for Wooden Boats (suggested donation: $10 or more). Snacks, beer and wine provided.

Space is limited, so RSVP by clicking here.

*As an authors note, I just want to say that it doesn't get much better than this. Three Sheets + Armchair Sailor + CWB + Nautical Books = Love.